Installation Report
Online Installation Report
Installation Report PDF
Installer Documents
Installer Application
Assembly and Installation Sybr-Aer 500 800 GPD (32MB)
Assembly and Installation Sybr-Aer 1000 1500 GPD (29MB)
Warranty
Owner's Manual (8.4MB)
Operation, Maintenance and Troubleshooting (10.8MB)
Sybr-Aer Brochure
Sybr-Aer Brochure
Contact information
SBR Wastewater Technologies, Inc.
1501 Commerce Center Dr.
Franklin, Ohio 45005
Phone
937-790-4150
Toggle navigation
Home
How It Works
Installation
Products
Contact
Documents
How It Works
TREATMENT AS EASY AS 1,2,3!
AERATION CYCLE
Discharge Pump Off / Blower On
Duration: 20 Hours (4:00a.m. - 12:00a.m.)
Description:
Aerobic digestion occurs during the aeration cycle. Air from the diffusers continuously mixes the wastewater keeping solids in suspension. The process promotes the growth of aerobic bacteria that oxidize waste.
SETTLING CYCLE
Discharge Pump Off / Blower Off
Duration: 3 Hours (12:00a.m. - 3:00a.m.)
Description:
Suspended solids/sludge settles to the bottom of the tank and floating debris floats to the top during this process. During this period dissolved oxygen decreases promoting anaerobic conditions that convert harmful Nitrate to Nitrogen gas. The settling cycle is programmed to occur when the system receives the lowest inflow of wastewater.
DECANT CYCLE
Discharge Pump On / Blower Off
Duration: 1 Hour (3:00a.m. - 4:00a.m.)
Description:
Treated wastewater is pumped from the system during the decant cycle. The discharge pump is specifically positioned inside the tank to discharge effluent from the clarified zone developed during the settling cycle.